Acme Steel Company
Riverdale, Illinois
|
Study of Soak Zone
Combustion Problems #4 Hot Strip Mill Furnace
|
Acme Steel Company
Chicago, Illinois
|
Installation of Natural Gas/Air Mixing
Coke Oven Gas Distribution System
|
Acme Steel Company
Chicago, Illinois
|
Installation of Natural Gas Burners & Controls
Boiler Nos. 1-2-3-4
|
Argonne National Lab.
Argonne, Illinois
|
Update/Replacement of (5) Boiler Control Systems
New Distributed Controls Systems for:
Combustion & Furnace Draft
Drum Level Feed Water
Burner Management Systems
|
Double Eagle Steel
Dearborn, Michigan
|
Design of Steam Desuperheating Station
|
Double Eagle Steel
Dearborn, Michigan
|
Assist in the Installation Design & Start-Up
Package Boiler Plant
|
J.I. Case
Hinsdale, Illinois
|
Re-Work of Plan Secondary Cooling Water System
|
Inland Steel Company
East Chicago, Indiana
|
Turnkey Automation of Boilers
Steam Vessel-S.S. Wilfred Sykes
|
Inland Steel Company
East Chicago, Indiana
|
Upgrade of Boiler Automation
Steam Vessel- S.S. Wilfred Sykes
|
Inland Steel Company
East Chicago, Indiana
|
Turnkey Automation of Boiler Room
Steam Vessel- S.S. E.L. Ryerson
Project included design & installation of:
New windboxes & burners
Combustion & feedwater control
Burner Management System
|
Inland Steel Company
East Chicago, Indiana
|
Turnkey Automation of Boiler Room
Steam Vessel - S.S. P.D. Block
Project included design & installation of:
New windboxes and burners
Combustion & feedwater control
Burner Management System
|
J & L Specialty Steel Inc.
Detroit, Michigan
|
Engineering Survey of Plant Steam System
Field condition & recommended improvements
|
J & L Specialty Steel Inc.
Louisville, Ohio
|
Development of Feasibility Study
Replace Central Boiler House with unmanned "Ohio Specials"
|
J & L Specialty Steel Inc.
Midland, Pennsylvania
|
Installation of a Zurn Package Water Tube Boiler
|
J & L Specialty Steel Inc.
Midland, Pennsylvania
|
Development of Feasibility Study
Waste Heat Boiler System-DRAP Line
|
Jones & Laughlin Steel
Cleveland, Ohio
|
Plant Energy Study
Developed balance between BFG-Steam-Power Generation
|
Jones & Laughlin Steel
Pittsburgh, Pennsylvania
|
Conversion of South Side Boiler House to burn COG
Design engineering & procurement of material and equipment
|
Jones & Laughlin Steel
Pittsburgh, Pennsylvania
|
Design of Fuel Oil System for Coke Plant Boiler House
|
Jones & Laughlin Steel
Cleveland, Ohio
|
Revamp of Exhaust Steam System, Study and Design
|
Jones & Laughlin Steel
Aliquippa, Pennsylvania
|
Study of Soaking Pits, Productivity and Capacities
|
Jones & Laughlin Steel
Aliquippa, Pennsylvania
|
Study of Capacity and Control Problems
For 400,000 lbs./hr Blast Furnace Gas fired boiler
|
LTV Steel Company
Indiana Harbor Works
|
Engineering of Installation of New Pilots and Main Burner
Boiler Nos. 4-5-6 @ Blast Furnace Boiler House
|
LTV Steel Company
Indiana Harbor Works
|
Study of City Water Distribution System
|
LTV Steel Company
Indiana Harbor Works
|
Plant Overall Energy Study and Balance
Developed balance between BFG-Steam-Power Generation
|
LTV Steel Company
Indiana Harbor Works
|
Upgrade of Descaling Pump System
Re-circulation System - 84" Hot Strip Mill
|
LTV Steel Company
Chicago, Illinois
|
Conversion of Blast Furnace Gas Fired Boiler
to Coke Oven Gas
|
LTV Steel Company
Chicago, Illinois
|
Study of Coke Oven Gas Distribution System
|
LTV Steel Company
Chicago, Illinois
|
Feasibility Study
Conversion of Turbo Blower to a Turbo-Generator
|
LTV Steel Company
Chicago, Illinois
|
Detailed Design Engineering
Conversion of Turbo Blower to a Turbo-Generator
|
LTV Steel Company
Chicago, Illinois
|
Feasibility Study
Replacement of Steam and Coke Oven Gas
Bar Mill Division
|
National Steel Company
Great Lake Division
Detroit, Michigan
|
Feasibility Study
Upgrade of Coke Oven Gas Combustion System
Reheat-Furnaces- 80" HSM
|
Navistar International Corp.
Chicago, Illinois
|
Design of Deaerator installation
Design Upgrade of Feedwater System
Design of plant compressed air dryer installation
|
Navistar International Corp.
Springfield, Ohio
|
Design of plant compressed air dryer installation
|
Navistar International Corp.
Rock Island, Illinois
|
Design of dry scrubber pollution control system
for coal fired boiler house
|
Navistar International Corp.
Memphis, Tennessee
|
Design of 80,000 lb/hr package boiler and
auxiliary water treatment system installation.
Design of 2,000 SCFM rotary air compressor installation
|
Navistar International Corp.
Burr Ridge, Illinois
|
Design of Replacement Chilled Water System for
Computer System
|
Navistar International Corp.
Libertyville, Illinois
|
Design of 15KV Power Distribution Network
Design of elevated mezzanine platform system
Design of Plant Fire Sprinkler System
|
Northern Illinois Gas
Aurora, Illinois
|
Boiler Fuel Study
Installation and Operating Cost Comparisons
Coal Fired Boilers vs. Natural Gas Firing
|
Republic Steel Corporation
Massillon, Ohio
|
Feasibility Study and Detailed Design Engineering
Installation of 75,000 lbs./hr coal fired Boiler and Bag House,
Renovation of Feedwater Treatment Plant for Blrs. No. 3-5-6
|
Republic Steel Corporation
Chicago, Illinois
|
Cost Study of the Redesign of Car Bottom Heating Furnace
|
Republic Steel Corporation
Chicago, Illinois
|
Engineering Study
Increased capacity of existing Billet Reheat Furnace and
Addition of Heat Recovery Equipment
|
Republic Steel Corporation
Warren, Ohio
|
Detailed Design Engineering
Installation of a 300,000 lbs./hr. BFG fire boiler
including: total foundation and building design,
Complete piping & electrical design
|
Republic Steel Corporation
Warren, Ohio
|
Detailed Design Engineering
Main (1000#/910 F) & Exhaust (225#/ 550 F) steam piping
Installation of a 10 MW topping turbine generator
|
Republic Steel Corporation
Warren, Ohio
|
Feasibility Study and Preliminary Design
New Coke Oven Gas Supply System for the
Blast Furnace Boiler House
|
St. Margaret Hospital
Hammond, IN
|
Detailed Design Engineering
Installation of 30 M lbs./hr. Package Boiler
|
St. Margaret Hospital
Dyer, IN
|
Detailed Design Engineering
Installation of a complete Boiler House
|
Uniroyal, Inc.
Joliet, Illinois
|
Detailed Design Engineering
Rehabilitation of existing Boiler House
Three (3) 175,000 lbs./hr coal fired boilers
including; preparation of cost estimates,
specification and bid drawings,
testing of new equipment
|
U.S. Steel Corporation
Gary Works
|
Feasibility Study and Detailed Design Engineering
Installation of Economizers on two (2) Waste Heat Boilers
@ 84"Hot Strip Mill
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Replacement of Existing Feed Pump Turbine Drive with
Topping Turbine Driver- No. 4 Feedwater Pump @ TBBH
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Modification of 18" Blow-Off Valve- No. 13 Blast Furnace
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
New Control Systems- No. 2D & 3 Pre-Carbon Lines
Coke Plant
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Installation of a 165 M lbs./hr High Pressure Package Boiler
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Installation of a 265psig 20" Steam Transmission Pipe Line
Approximate Length: 15,000 feet
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Upgrade of Operating Steam Pressure from 265# to 675#
No. 4 Boiler House
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Installation of a 675psig 24" Steam Transmission Pipe Line
Approximate Length: 3,500 feet
|
U.S. Steel Corporation
Gary Works
|
Detailed Design Engineering
Upgrade of Boiler Nos. 1-2-3-5-6
Turbo Blower Boiler House
including: replacement of F.D. & I.D. Fans
replacement of multi-fuel burners
replacement of BFG-MG-FO fuel systems
installation of a DCS Combustion Controls
installation Burner Management Systems
|
U.S. Steel Corporation
Gary Works
|
Preliminary Design Engineering
Upgrade of Cold Blast Mains
|